Purpose: To carry out a detailed instrumental environmental assessment of the level of pollution of soil, subsoil and groundwater of an industrial site in accordance with the ASTM E1903-19 standard " Standard Practice For Environmental Site Assessments: Phase II Environmental Site Assessment Process" of the territory of the decommissioned enterprise.
In addition to the assessment of chemical pollution, Phase 2 was tasked with assessing the use of asbestos-containing materials in the construction and operation of production and auxiliary facilities of the Site, their presence in existing buildings and structures, as well as in the surface horizons of soils.